Connection queue by stage and price area

Stage / metricTotalNO1NO2NO3NO4NO5
Queue
# applications35911691585638
MW consumption16 7602 6896 0762 8343 8121 349
MW production8 3842 8462 4241 480857776
Reserved
# applications34882100408145
MW consumption7 6201 7792 3368041 6881 014
MW production8 3671 4243 3381 0824562 067
Connected
# applications1602831424415
MW consumption2 444306786612448291
MW production3 3792858891 0011 075128
Total (all stages)
# applications86722622214018198
MW consumption26 8244 7749 1984 2515 9482 654
MW production20 1304 5566 6513 5632 3892 972

Case counts by Statnett price area (NO1–NO5) across the grid connection process. Mature stages (Queue, Reserved, Connected) show committed MW by side. Excludes the flexibility/storage side and unclassified cases; a few cases with no price area are counted in Total only. Source: Statnett. As of 2026-11-08.

Note on data aggregation: The map aggregates capacity requests at main transmission grid nodes on a best-efforts basis using spatial proximity. It does not assess local grid congestion, local reinforcement needs, or the feasibility of individual connection requests. The aggregation is indicative only. For site-specific grid studies, local congestion analysis, or project-level assessments, contact MeginLeid directly.